The only truly secure system is one that is powered off, cast in a block of concrete and sealed in a lead-lined room with armed guards. And even then I have my doubts. (Gene Spafford)
On September 9th, 1947, Grace Hopper found the first computer bug in history. It was a mouth stuck between relays of the Harvard Mark II computer, she documented this finding in her log book.
Software systems are part of our everyday life, used almost everywhere in almost every sector (e.g.: financial, government, transport, medicine, entertainment, etc). Even though they are getting more and more common to achieve even the simplest tasks, we have all experienced software systems failing. Thatâs why testing is necessary.
Common Terms
From the International Software Testing Qualifications Board (ISTQB) Standard Glossary of Terms.
- Testing is the process concerned with planning, preparation, execution, and evaluation with the objective of finding defects in our software products.
- Error, a human can make an error (aka mistake). An error is a human action that produces an incorrect result.
- Defect, an error can cause a defect (aka fault or bug). A defect is a flaw in a component or system that can lead it to fail to perform its required function. It can be at a software, system, or documentation level. Defects occur simply because human beings are fallible, we can often find ourselves dealing with time pressure, complex code, complex infrastructures, changed technologies, among others.
- Failure, a defect may result in a failure. Itâs a deviation of the component or system from its expected delivery, service, or result. Failures can be caused by environmental conditions such as radiation, magnetism, electronic fields, and any kind of pollution. These conditions may change hardware behavior, then influence the execution of software.
- Quality is the degree to which a system meets specified requirements, needs, and expectations.
- Risk, a factor that could result in future negative consequences.
- Exit criteria, the set of conditions for permitting a process to be officially completed. These conditions are often agreed with the stakeholders. Exit criteria may be defined based on cost or time constraints, number of defects remaining (to be fixed), percentage of tests run without incident, among others.
- Validation, answers the question of âare we building the right product?â
- Verification, answers the question of âare we building the product right?â
General Principles of Testing
Testing Shows Presence of Defects
(1) The probability of the existence of more errors (defects) in a section of a program is proportional to the number of errors (defects) already found in that program. (2) Do not plan a test effort under the tacit assumption that no errors (defects) will be found (3) A good test is one that has high probability of detecting an as-yet undiscovered error (defect). (4) A successful test is one that detects an as-yet undiscovered error (defect). (Myers, 2004)
By testing, the only thing we can actually prove is that there are defects. What we cannot do at all is to prove that there are no defects (at least Testing cannot do it).
Exhaustive Testing is Impossible
Have no fear of perfection, you will never reach it. (Salvador Dali)
For most cases we cannot test everything, it would be almost impossible because of the complexity or the time it would take, we need to prioritize using a risk-based approach to define what actually needs to be tested.
Early Testing
Testing activities should start as early as possible in the development/design cycle. As later in the process we test, the more expensive it will be to correct the defects.
Defect Clustering
In any form of testing it is impossible to achieve total confidence. The only exhaustive testing there is, is so much testing, that the tester is exhausted. (Bill Hetzel)
Defects are not evenly spread in a system, they are usually confined to a small number of modules. Itâs said they are clustered. Similarly to defects, failures also tend to be close to each other.
Pesticide Paradox
Itâs called the âpesticide paradoxâ after the agricultural phenomenon, where bugs were able to build tolerance to pesticides, leaving us with the choice of; ever-more powerful pesticides followed by ever-more powerful bugs; or an altogether different approach. (Beizer, 1995)
As programmers fix defects, and the quality of the software improves, the effectiveness of the previous tests erodes. We must create new tests as old ones become useless, by doing so, more defects can be found in the future.
Testing is Context Dependent
Testing is done differently in different projects. Severity and standards may vary from context to context, so investment on testing should adapt to the given conditions (e.g.: compare a software to share media, with one to save lives). Usually testing can be about 50% of the development costs but, as said before, it may vary.
Examples of permitted failures per KLOC:
- 3 to 10 for commercial software.
- 1 to 3 for industrial software.
- 0.01 for NASA shuttle code.
Absence-of-Error Fallacy
Trust, but verify. (Russian proverb)
The fact of making improvements in the system by fixing bugs, doesnât really mean there are no more bugs. The system may still be unusable or at least not good enough to meet the requirements.
The Role of Testing
Testing is a measurement of software quality. (Bill Hetzel, 1988)
Testing is used to find defects (so they can be fixed) before the system is released. By doing so, we reduce the risk of problems occurring in an operational environment and contribute to the quality of the software system. Testing may also be required to meet contractual or legal requirements, as well as industry-specific standards.
Testing is any activity aimed at evaluating an attribute or capability of a program or system and determining that it meets its required results. (Bill Hetzel)
Testing can help us measure the quality of the system, quality can be measured in terms of defects found. The higher the amount of defects, the closer we are to the highest quality product. Defects can be functional or non-functional (e.g.: reliability, usability, efficiency, portability, and maintainability).
Quality is not intangible. The purpose of testing is to make quality visible. Testing is the measurement of software quality! (Bill Hetzel)
In some cases the main objective of testing may be to assess the quality of the software (with no intention of fixing defects), to give information to stakeholders of the risk of releasing the system at a given time. The decision of releasing (or not) should be taken by the whole team, itâs not (only) the testersâ responsibility.
Enough is Enough, but How Much is Enough?
Test estimation is hard to do perfectly, but not that hard to do well. -Black, 2002
To decide how much testing is enough, we should take into account:
- The level of risk.
- The time and budget constraints.
Risks should be evaluated at the business, technological, project, and testing level. They are also used to determine where to start testing and where more testing is needed. The risk considerations can include financial implications, legal actions, delivery delays, potential loss of reputation, potential loss of life, among others.
Debugging and Testing
As said before, testing aims to find and report a defect. While debugging, on the other hand, is used to find and fix an error, the cause of a defect. After a correction is made, some check should be done to verify the defect was fixed. New tests are run to ensure that new defects were not introduced among the corrections.
Debugging is a two-step process that developers go through after a test successfully reported a defect. First, we need to identify the error that causes the defect in the code by isolating and locating it. Second, we fix the error.
In short:
- Testers test to ensure the system meets its requirements.
- Developers debug to fix (met but) broken requirements.
Infamous Hall of Fame
Testing can only show the presence of errors, not their absence. (Edsger Dijkstra, Computing Pioneer, 1972)
Sometimes a bug can make us waste a couple of minutes, but sometimes it can lead a system to do exactly the worst thing we can (or actually cannot) imagine, such as losing a huge amount of time, millions of dollars, or even human lives.
Ariane 5
Ariane 5, 1996, a rocket that lost its guidance and exploded about 40 seconds after launch, resulting in a loss of +$370 million. The code from Ariane 4 was reused while the hardware was partially different, causing an integer overflow while converting data.
More at Ariane 5 (bugsnag.com).
Mars Climate Orbiter
NASA launched the Mars Climate Orbiter in 1998, but in 1999, communication was permanently lost. It went too close to the planet, and it was either destroyed in the atmosphere of Mars or entered an orbit around the Sun. The bug was a measurement mismatch between two different systems, one of them used metric units, while the other imperial units (they didnât know that). The cost of the mission was +$320 million.
More at Mars Climate Orbiter (bugsnag.com).
Knight Capital
In 2012, Knight Capital deployed an update to the production servers. Due to the use of an old and incorrectly configured system, the servers automatically executed 4 million wrong trades in 40 minutes. They were wrong because the order was to: buy a stock at its âaskâ (high) price and immediately sell it at the âbidâ (low) price, which is exactly the opposite of how stock exchange works. They lost +$460 million.
More at Knight Capital Group (bugsnag.com).
Therac-25
Therac-25 was a radiation therapy machine built in 1985, it was designed to use software-based safety systems rather than (the standard) hardware controls. That had tragic consequences. The immaturity and poor quality of the software led the machine to apply deathly radiation doses, killing three people and causing injuries to at least three others.
More at Therac-25 causes radiation overdoses (bugsnag.com).
General Electric Energy - Blackout of 2003
The blackout of 2003 (US and Canada) affected around 50 million people for 2 hours up to 4 days. The event contributed to at least 11 deaths (and possibly ~100). Economical effects are unmeasurable, but estimations say it reduced the US earnings by +$6.4 billion. It all happened due to a bug from the General Electric Energyâs software that stalled the alarm system of FirstEnergy, making operators unaware of a downed power line, causing other ones to overload and overheat in cascade.
More at Northeast blackout of 2003 (en.wikipedia.org).
Early Release of Prisoners
Department of Corrections of Michigan, between 2003 and 2005, a bug in the software that calculates the release dates resulted in the early release of 23 inmates, from 39 to 161 days earlier, some others had the period prolonged.
More at:
- Michigan PC glitch lets prisoners out early (theregister.com).
- Computer glitch gives seven Mich. prisoners early release (computerworld.com).
American Airlines - Grounded Flights
In 2013, the airline American Airlines was forced to ground flights for several hours due to a bug in the program that accesses the booking system. More than 500 flights were canceled and many more were delayed.
More at:
- American Airlines Resumes Flights After a Computer Problem (nytimes.com)
- Un error informĂĄtico cancela y retrasa cientos de vuelos de American Airlines (elmundo.es) [es-ES].
United Airlines - (Almost) Free Tickets
United Airlines, in 2013, *sold tickets for 10, instead of the whole ticket price that could cost as much as $800.
More at United Airlines to honour tickets issued for $0 in glitch (bbc.com).
Patriot Failed to Defend
The MIM-104 Patriot missile battery used in the Persian Gulf War in 1991, successfully detected, but miscalculated the position of an enemy missile due to a bug in the software that converts tenths of seconds to seconds. A small defect (0.000000095 seconds per iteration), but repeated for more than 100 hours. It led to the system to miss for almost 600 meters, âthinkingâ the missile wasnât a threat, then letting it hit the US Armyâs barracks, killing 28 soldiers and causing injuries to about 100 people.
More at:
- The Patriot Missile Failure (iro.umontreal.ca).
- Failure at Dhahran (en.wikipedia.org).
- Software Problem Led to System Failure at Dhahran, Saudi Arabia (gao.gov).
Reference:
- 70 Years Since the Discovery of the First Computer Bug (bugsnag.com).
- Perfect Software (page 13, 19, 24, 56).
- Software Engineering (page 206).
- Software Testing (page 11, 14, 15).
- The Pragmatic Programmer (page 361).